Stora Enso invests in automated CLT coating line for shortened construction times
Stora Enso invests EUR 9 million in an automated CLT (cross-laminated timber) coating line at the Ybbs sawmill in Austria. The investment will further strengthen Stora Enso’s position as a leading global provider of engineered wood products for low carbon, sustainable buildings. In the construction industry, there is labor shortage and a pressure to shorten the construction time on-site. The investment enables industrially pre-applied CLT coatings on the CLT walls and floors produced at Stora Enso’s Ybbs site. The automated coating solution results in shorter construction times and higher wood protection. “With this new automation line, we can apply high-quality water-based coating to approximately 500,000m² of CLT walls and floors per year – making us the world leader in this segment. Our customers will benefit from improved protection of CLT against moisture, sunlight, insects and fire, as well as nicely coloured visual surfaces,” says Lars Völkel, EVP Wood Products division.