ANDRITZ to supply four high-speed tissue production lines to Bracell SP Celulose Ltda., Brazil
International technology group ANDRITZ has received an order from Bracell SP Celulose Ltda. to supply four PrimeLineTM W 2000 tissue production lines to its mill located in Lençóis Paulista, São Paulo.
Start-up is scheduled for 2024.
The four tissue machines are of the type PrimeLineTM W 2000, with a design speed of 2,100 m/min and a working width of 5.68 m. They are equipped with fully cantilevered shoe presses for gentle dewatering and easy maintenance and 18 ft. steel Yankees with steam-heated hoods for energy-efficient drying.
The new tissue mill will be self-sufficient in steam and electricity consumption for the drying process, making it one of the tissue mills with the smallest CO2 footprint in the world.
ANDRITZ’s scope of supply – on EPC basis including civil construction – includes the stock preparation systems that will process slush pulp from Bracell’s own pulp mill, rewinders and roll handling, as well as roll covers, machine clothing, shoe press belts, and additionally more than 100 units of high-efficiency process pumps.
more at: https://www.andritz.com/newsroom-en/pulp-paper/2022-10-04-bracell-group